PASS 2024 UTME WITHOUT STRESS:- DOWNLOAD and PRACTICE with 2024 UTME CBT APP 📱👈
😂 GUARANTEE|:| STUDY, WORK AND LIVE IN THE UK >>>.:- STUDY IN UK! Here is How to Apply to Study and Work In the United Kingdom in 2024

Estimating and Budgeting a Medium Scale Building Project

Download complete project materials on Estimating and Budgeting a Medium Scale Building Project from chapter one to five with abstract and references

ABSTRACT

This project, focus on preliminary activities that lead to draft bill of qualities for a propose multi-purpose studio hall, Ilorin. It’s centralized on preparation of bill of qualities for a studio hall and taking offs project.

Meanwhile, this is to prepare the construction legation and to understand the construction arrangement between the client and the client and the construction company, industry.

TABLE OF CONTENTS

Title page

Certification

Dedication

Acknowledgement

Gratitude

Table of content

CHAPTER ONE

1.0    Background Information

1.1    Description of work

1.2    Aims & Objectives

1.3    Scope of the Project

CHAPTER TWO

2.0    Title

2.1    Location

2.2    Site Description

2.3    Accessibility

2.4    Availability and Proximity of Resource

2.5.   Definition of terms

CHAPTER THREE

3.0    General rules for taking-off

3.1    Receipt of the drawings

3.2    Preliminary study of drawing

3.3    Queries with the designers

3.4    Organizing the work

3.5    Section of taking-off

3.6    Composition & Preparation of BOQ

3.7    Stages in BOQ

3.8    Method of bill preparation

3.9    Rules of Billing

CHAPTER FOUR

4.0    Sub Structures

4.1    Super Structure

4.2    Abstracting

4.3    BOQ

4.4    Quarry sheet and drawing plan

CHAPTER FIVE

5.0    Summary

5.1    Conclusion

5.2    Recommendations

5.3    References

CHAPTER ONE

1.0 BACKGROUND INFORMATION

This project is based on proposed multi-purpose studio hall off Oke Ose community central mosques Ilorin.

Kwara state is one of the 36 states in Nigeria, in which Ilorin is the Capital; in Kwara state we have several higher institutions which include university of Ilorin, Kwara State Polytechnic, Federal Polytechnic Offa, College of Education Oro, Kwara State University Ilorin and also College of Education Ilorin.

TELEVISION STUDIO

A television studio is an installation in which video production take place, either for the recording of live television to video tape, or for the acquisition of raw footage for post production.

STUDIO FLOOR

A studio floor is the actual stage on which the actions that will be recorded take place. Studio floor has the following characteristics and installations:-

Decoration or sets

1. Professional video camera (sometimes one usually several) on pedestals.

Microphones

2. Stage lightning rigs and the associated controlling equipment.

3. Several video monitors for visual feedback from the production control room (PCR).

4. A small public address system for communication

A glass window between PCR and studio floor for direct visual contract is usually desired, but not always possible while a production is in progress, people composing a television crew work studio floor.

PRODUCTION CONTROL ROOM

The studio control room (SCR) is the place in a television studio in which the compositions of the outgoing program take place. The production control room is occasionally also called a studio room.

MASTER CONTROL ROOM

The mater control room, house equipment that is too noisy or runs too hot for the production control room (PCR). It also makes sure that coax cable and other wire lengths and installation requirement keep within manageable lengths since most high-quality wiring runs only between devices in this room.

OTHER FACILITIES

A television studio usually has other rooms with no technical requirement beyond broadcast reference monitors and studio monitors for audio. Among them are:-

  • One or more make-up and changing rooms.
  • A reception area for crew, toilet and visitors, commonly called the green room.

The design term on consultancy, services headed by the Architects, civil engineers, who carry out the design, this process are a planned office works into the requirement of the client. The production of a building in a more economical, quick and orderly manner, other professional function along side with the architect for the cost implication and preparation of bill of quantities (BOQ).

The expected professional needed at the stage is the quantity surveyor. His concern is the economics of all resources such as labor, plant materials and financial aspect in order to produce building in the quick and economical manner because many building today have not been completed.

1.1   DESCRIPTION OF WORKS

These projects consist of construction and erection of the proposed Multi-Purpose studio Hall situated at Oke-Ose community at University of Ilorin teaching hospital Ilorin Kwara State, Nigeria.

The studio development and take off project will be constructed on loamy soil of about 28,410 in length and 13,820 widths.

The construction is formed on plain over site concrete floor is of reinforce concrete slab (150mm thick). The walls are 230mm tick concrete block. The roofing used in long san aluminum roofing sheet fixed a roofing structure, plumbing installation, electrical installation complete etc.

1.2   AIM AND OBJECTIVES

The major aim of the study is to estimate and budget for proposed Multi studio hall at Oke Ose community, Ilorin.

OBJECTIVES

  • To understand bill operation of taking off process, abstraction bill drafting and pricing.
  • To understand the process of site feasibility report.
  • To understand the process of given pre-construction cost of any proposed project.

1.3   SCOPE OF THE PROJECT

The scope of the project is to prepare a draft bill of quantities for a proposed multipurpose studio hall.

However, the limitation may not be accurate as a result of:

  • Inability of conduct proper site investigation.
  • Inability of conduct the architect that designs the project

 

SEE >> HOW TO DOWNLOAD THE COMPLETE PROJECT (CHAPTER 1-5) NOW

>GUARANTTEE|:| Score 280 Above in 2024 UTME👉 DOWNLOAD FREE JAMB CBT APP HERE:.: GURRANTTEE Score 280 Above in 2022 UTME👉 DOWNLOAD FREE JAMB CBT APP HERE 📱👈
WISH TO STUDY & LIVE in UK?:- STUDY, WORK AND LIVE IN the UK Application Form NOW OUT. Call 08030447894

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.