Design and Construction of Uninterruptible Power Supply

Design And Construction Of Uninterruptible Power Supply is a complete project materials from chapter one to five with references and abstract.

CLICK HERE TO DOWNLOAD THE COMPLETE MATERIAL (CHAPTER 1 -5)

ABSTRACT

The uninterruptible power supply (UPS) is design to help in the offices, workshops and house hold appliances, due to the unstable power supply being supplied by (NEPA) presently known as Power Holding Company of Nigeria (PHCN) usually supply to us.

With the help of the β€œUPS” we don’t need to depend much on PHCN it is stress free because it don’t need someone to change it over when light goes off, once there is any power failure it will automatically switched on and when power comes it will switch off and start charging the battery.

Another interesting thing in the UPS is that it does not need any external charger for charging the battery when it goes low, it have already built charger inside the UPS when there is light it will be charging the battery.

TABLE OF CONTENTS

COVER PAGE

TITLE PAGE

APPROVAL PAGE

DEDICATION

ACKNOWLEDGEMENT

ABSTRACT

TABLE OF CONTENTS

CHAPTER ONE

INTRODUCTION

INVERTER SECTION/OSCILLATION

AUTOMATIC CONTROL SECTION

AIM OF THE DESIGN

CHAPTER TWO

DEFINITION OF TERMS/COMPONENTS DESCRIPTION

RESISTORS

CAPACITORS

TRANSISTORS

FIELD EFFECT TRANSISTORS

RELAYS

DIODE

TRANSFORMER

CHAPTER THREE

SECTIONAL DECRIPTION FO THE SYSTEM

OSCILLATION CIRCUIT SECTION

CIRCUIT OPERATION

WAVEFORM OF AN OSCILLATION

WAVEFORM OF AN INVERTER

SWITCHING CIRCUIT SECTION

POWER TRANSFORMER AND IVNERTER ACTION

PRECAUTION DURING WINDING OF TRANSFORMER

AUTOMATIC CIRCUIT SECTION/CHARGER

COMPLETE CIRCUIT DIAGRAM OF THE UPS

CHAPTER FOUR

CONSTRUCTION PROCEDURE AND TESTING

CASIG AND PACKIGN

ASSEMBLING OF SECTIONS

TESTIGN OF SYSTEM OPERATION

CHAPTER FIVE

PROBLEMS ENCOUNTERED, CONCLUSIONA ND RECOMMENDATION

PROBLEMS ENCOUNTERED

RECOMMENDATION

CHAPTER SIX

COST ANALYSIS

REFERENCES

CHAPTER ONE

INTRODUCTION

Uninterruptible Power Supply (UPS) is used to continue the flow of current and also make voltage to be steady as soon as NEPA source is interrupted.Β  They are divided into various sections, which are

INVERTER SECTION

In this section, the Direct Current (DC) voltage is converted into an Alternate Current (AC) voltage with the help of the oscillation. An oscillator is an electronic circuit that produces an output signal without any applied external input signal.

The inverter (Not Circuit) performs a basic logic function called inversion or complementation.Β  The purpose of the inverter is to change on logic level (High/Low) to the opposite logic level.Β  In terms of bits, it changes a β€˜I’ to a β€˜O’ and vice versa.

This section also consists of two stages of switching circuits which comprises of FIELD EFFECT TRANSISTORS.

The oscillator has two output terminals each of the switching circuits is coupled to the two output terminals of the oscillator respectively.Β  This is elaborated in the subsequent chapter.

AUTOMATIC CONTROL SECTION

This section produces all the required controls needed to meet up with the main aim of the entire system.Β  It controls automatically β€˜ON’ of the system into NEPA and hence obtaining a NEPA line as the output of the system and same time linking battery charger into charging the battery.Β  Also switching β€œON” of the inverter into functional mode as soon as power interruption is experienced and this is done by the automatic circuit. This automatic circuit makes sure that no line is colliding by properly carrying out the exchange system with the help of the relays.

AIM OF THE DESIGN

The Uninterruptible Power Supply (UPS) provides the efficiency in the use of power appliance by ensuring continuous availability of power supply in the absence of NEPA source.

For a better output to be produced, it is advisable to charge the battery to its full condition and also make sure that the battery has enough ampere so as to withstand much load.

To eliminate excessive heat in the circuit, proper heat sink should be sued or a cooling fan, so as to reduce any heat that on the transistors.

The rated value for this UPS is 1000W at 240V and 50HZ. It is expected at all condition being favourable to carry load of higher power factor at approximation of the power stated. It can last for days depending on the load.Β  It is advisable not to overload it because it can damage the circuit.

CLICK HERE TO DOWNLOAD THE COMPLETE MATERIAL (CHAPTER 1 -5)

>GUARANTTEE|:| Score 280 Above in 2024 UTMEπŸ‘‰ DOWNLOAD FREE JAMB CBT APP HERE:.: GURRANTTEE Score 280 Above in 2022 UTMEπŸ‘‰ DOWNLOAD FREE JAMB CBT APP HERE πŸ“±πŸ‘ˆ
WISH TO STUDY & LIVE in UK?:- STUDY, WORK AND LIVE IN the UK Application Form NOW OUT. Call 08030447894

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.